Regulation · 6 min read
NCC 2022 livable housing: what applies to new homes in NSW

NCC 2022 introduced a Livable Housing Design Standard for new houses and apartments. It is a common source of confusion in NSW, because it does not currently apply here.
What the standard requires
The standard is based on the silver level of the Livable Housing Design Guidelines. It is aimed at making homes easier to enter and move around in, with features such as:
- A step-free path to an entrance door
- Wider internal doors and corridors
- A toilet on the entry level
- A step-free shower
- Wall reinforcement in bathrooms so grab rails can be added later
Where NSW stands
NSW has not adopted the NCC 2022 livable housing provisions for houses (Class 1a) or for apartments (Class 2 sole-occupancy units). The NSW parts of the code that would carry them have been left blank. Building Commission NSW released a discussion paper in January 2025 reviewing whether the exemption should stay.
Certifier’s note
Do not assume an accessibility feature is optional. Check the building classification, the approved plans, the consent conditions and the planning controls first.
When accessibility rules still apply
Other accessibility requirements can still apply. The NCC can require accessible paths through the common areas of apartment buildings. Planning controls, conditions of consent and the brief for a social or specialist housing project can also set requirements.
For apartment developments, the NSW Apartment Design Guide includes universal design guidance, with a benchmark of 20 per cent of apartments having Silver level features. That is design guidance for qualifying developments, not a building code rule for every apartment.
What NCC 2022 did change in NSW
Most of NCC 2022 applied in NSW from 1 May 2023, including the restructured code and the new Housing Provisions Standard. Energy efficiency for new homes in NSW is dealt with through BASIX, alongside the NSW energy efficiency provisions of the NCC.
What is coming
NSW has announced 1 May 2027 for adoption of NCC 2025. That date is for the code as a whole and does not by itself mean the livable housing standard will apply. For projects near the changeover, which edition applies depends on the application dates, the NSW variations and the transitional arrangements, so check with your certifier.